Franklin County, IL · Pond Construction
Farm ponds, fishing ponds, and wildlife water holes built across Southern Illinois. Full turnkey from site selection to finish grade. We handle everything.
What We Do
Building a pond in Southern Illinois isn't complicated if you know what you're doing. The clay soils across most of the region hold water well. The terrain gives you natural draw sites that barely need an excavator. The problem is when someone builds it wrong, undersized spillway, weak dam core, wrong site, and it never fills or fails after the first big rain.
We've been doing this long enough to know where ponds work and where they don't. We site them right, build the dam compacted and solid, and spec the spillway for what the drainage area actually puts through it. You end up with water on the property instead of a dry hole.
One crew, one contract, start to finish. No subs, no handoffs, no excuses about what the other guy left them.
Call 618·417·7381 →
Real Project
Drag to compare
Scope of Work
Every pond project is different but the scope is always the same: we handle the whole thing. Site selection through finish grade, one crew, one call.
We walk the property with you and identify the best location based on drainage area, soil type, topography, and how you plan to use the water. A bad site picked cheap costs more to fix than it cost to build wrong the first time.
Trees, brush, and stumps removed from the pond area and dam footprint before any dirt gets moved. Organic material left in a dam core is how dams fail. We strip it clean before we compact anything.
Excavating the pond basin to the planned depth and contour. Deep enough to stay cool, shaped to hold fish if that's the goal, and cut to give you the volume you need for livestock or drought drawdown.
Compacted clay dam built in lifts, keyed into undisturbed soil, with a core trench where needed. The dam is where most cheap pond jobs fail. We build them to hold for decades, not for the first contractor walk-through.
Principal and emergency spillway sized for the drainage area. Gets you through a 10-year rain event without overtopping the dam. Pipe risers, barrel drains, or open channel depending on what the site calls for.
Dam faces and disturbed areas graded smooth and seeded for erosion control. You want grass on the dam before the next hard rain. We don't hand you a bare dirt pile and call it done.
What Are You Building
The purpose changes the design. Tell us what the water is for and we'll build the right pond for it.
A fishing pond done right holds water through a dry summer, stays deep enough to keep fish through winter, and has the right shoreline shape to be fishable. We build them with bass and bluegill management in mind: deep sections for thermal refuge, shallows for spawning, gradual shoreline transition.
Deer, ducks, and turkey all respond to reliable water on the property. A well-placed water hole in the right funnel changes how animals use your land. We build these to fit your habitat plan: positioned for prevailing wind, accessible for upland wildlife, shaped for waterfowl if that's the goal.
A stock pond needs to hold enough water through a dry summer to keep your animals watered without a well. That means sizing the drainage area correctly, building the dam to hold, and protecting the shoreline from hoof traffic that will otherwise destroy it. We've built ponds that outlast the fence lines around them.
How It Works
We walk the property with you at no charge. We're looking at drainage area, soil type, topography, and what the site will actually support. Some sites are natural pond locations. Some aren't. We'll tell you which one you have before you spend any money.
After the site visit we put together a design covering pond size, dam dimensions, spillway spec, and clearing scope, plus a firm quote. No open-ended numbers. You know what you're signing up for before a machine shows up.
Most private land farm ponds in Illinois do not need a state permit. If your site is near a waterway or wetland that triggers IDNR or Army Corps review, we flag it at the site visit and walk you through what's needed. We don't start work until the paperwork is right.
Trees and brush removed from the pond footprint and dam area. Dam core stripped of all organics. This is the step that separates ponds that hold from ones that leak. It doesn't look like much, but it's where the job is won or lost.
Basin cut to depth and contour, dam built in compacted lifts, spillway installed. The main event. We work through it with the same crew start to finish. No handoffs to a sub who doesn't know what was planned.
Dam faces and disturbed areas finish graded, seeded, and ready for rain. You get a site that's done, not one that needs another crew behind us to clean up. When we leave, the pond is ready to fill.
Common Questions
It depends on size, location, and whether you're altering a waterway. Most farm ponds on private land do not require a state permit, but ponds built on or near streams or wetlands may need IDNR or Army Corps sign-off. We walk the site before any work starts and flag anything that needs to go through a regulatory process before a shovel touches the ground.
A typical farm or hunting pond takes one to three weeks from first dirt to finish grade, depending on size, site conditions, and how much clearing is required. Larger recreational ponds or sites with complicated drainage can run longer. We give you a realistic timeline after the site visit.
Late summer through fall is ideal in Southern Illinois. Ground is drier, water tables are lower, and newly seeded dam faces have time to establish before spring rains. We work year-round, but if you have a choice, August through October is the window most projects come out cleanest.
Yes. NRCS Practice 378 (Pond) and Practice 638 (Water and Sediment Control Basin) are both EQIP-eligible. Qualifying landowners can receive 50 to 75 percent of construction cost reimbursed through EQIP. You apply through your local NRCS office before work begins. We are experienced building to NRCS specifications and can coordinate with your FSA and NRCS contacts.
Full scope. Site selection, clearing, grubbing, excavation, dam construction, spillway, finish grading, and seeding. We bring everything needed to take the site from raw ground to holding water. You do not need to hire a separate crew for any part of it.
We primarily serve Franklin County and the counties that directly border it: Jefferson, Wayne, Hamilton, Williamson, Jackson, and Perry. We keep pond work close to home to keep mobilization costs reasonable. Moving a trackhoe and support equipment across the region adds real money to a job, and we'd rather be honest about that upfront. Call 618-417-7381 to confirm we can get to your site.
Get Started
Tell us what county you're in, how many acres you're working with, and what you want the water for. We'll schedule a site visit and put together a number.
Call 618·417·7381 →